Grey Construction
Schedule rescue · Industrial
600,000 sq ft of concrete. Four days.
0
sq ft in 4 days
- The challenge
- A scheduling mishap left a massive industrial build without cleaning coverage, with the closeout date locked and the walkthrough looming.
- What BLU did
- BLU mobilized a full crew within days, ran engineered zone assignments around the trades still on site, and worked the entire 600,000 square feet of concrete in a four day continuous push.
- The result
- Closeout stayed on schedule. In the superintendent's words: "Saved our butts."
“After a mishap with scheduling, the Blu Crew came in and cleaned 600,000 square feet of concrete in just 4 days. Saved our butts.”